Upcoming power transmission projects in India

932 live filings for new power transmission projects across 31 states and union territories, compiled from public records and updated to September 2026.

932live project filings
31states and UTs
248filings of ₹100 cr or more

Largest upcoming power transmission projects

Project (as filed)Location SectorDeclared cost
Ahmedabad – South Olpad (GIS) 765 KV D/C lineAhmadabad, Bharuch, Surat, Anand, Kheda, Vadodara, Surendranagar, GujaratPower Transmission₹ 47,84,42,000 cr
765 kV D/c Dausa-Ghiror Transmission Line in district Agra and Firozabad in the state of Uttar…Firozabad, Agra, Mainpuri, Bharatpur, Dhaulpur, Uttar PradeshPower Transmission₹ 5,81,14,509 cr
INTEGRATED PROJECT FOR CONSTRUCTION OF 33 KV TRANSMISSION LINE FROM 132 KV GRID-SUB STATION, N…Anugul, OdishaPower Transmission₹ 5,11,10,430 cr
400KV Garautha-talbehat Power transmission lineTikamgarh, Jhansi, Niwari, Madhya PradeshPower Transmission₹ 4,71,32,791 cr
Diversion of Forest land for Establishment of 400/220/132 KV sub station Pithora in Village Bh…Mahasamund, ChhattisgarhPower Transmission₹ 1,80,00,000 cr
Construction of the 400 kV Tata Power Vikhroli-Dharavi Scheme at Vikhroli, Mumbai, Maharashtra…Mumbai Suburban, MaharashtraPower Transmission₹ 1,77,00,000 cr

The largest filings by declared cost. Figures are as declared by the applicant. The full file carries every filing with coordinates, boundary and 50+ fields.

States with the most power transmission filings

State Live filings
Gujarat288
Rajasthan110
Maharashtra79
Madhya Pradesh70
Haryana69
Karnataka48
Jharkhand36
Odisha34
Uttar Pradesh32
Punjab22

Power Transmission projects by state

Common questions

How many upcoming power transmission projects are there in India?

The September 2026 ProjectIQ build holds 932 live power transmission filings across 31 states and union territories.

Which states have the most upcoming power transmission projects?

By number of live filings: Gujarat (288), Rajasthan (110) and Maharashtra (79).

How many large power transmission projects are coming up?

248 power transmission filings declare a project cost of ₹100 crore or more. Cost is as stated by the applicant.

How is the sector decided?

ProjectIQ assigns the sector from the filing's own text. Rows where the label rests on thin evidence are flagged in the file.

Download 25 free rows for power transmission projects

Real filings from this build, as CSV. The download starts immediately.